Archive for the ‘APC’ Category

Jun
24

PassQuick PB0-200 Practice Exams Description

Exam Number/Code: PB0-200

Exam Name: APC NCPI Design

VUE Code: PB0-200

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the PB0-200 exam? Searching PB0-200 Braindumps, APC PB0-200 Test Questions, PB0-200 Practice Exam, PB0-200 Dumps? PassQuick PB0-200 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick PB0-200 is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

Free PassQuick PB0-200 Practice Engine Demo Download

Download APC PB0-200 Pdf Exam

 
 
Exam : APC PB0-200
Title : APC NCPI Design

1. What is the most accurate way to determine the capacity of an existing standby generator?
A. ask the facility manager
B. calculate 30% over the UPS capacity
C. look at the generator name plate in the genset room
D. calculate capacity based on the load the generator is powering
Answer: C

2. How do you achieve full system redundancy in a precision air conditioning system?
A. install multiple air conditioning systems in an N+1 configuration
B. install a properly-sized DX air cooled unit with chilled water back-up
C. install a properly-sized air conditioning unit with redundant compressors
D. install Building System cooling (comfort cooling) with an air conditioning unit in standby
Answer: A

3. A site requires redundant power feeds to single-corded servers. What is a possible redundant configuration?
A. two single-module UPSs feeding one rack-mount Automatic Transfer Switch and one outlet strip per rack
B. two single-module UPSs each feeding dual-panel distribution boards, which in turn feed two outlet strips per rack
C. two single-module UPSs each feeding two outlet strips per rack; plugging half the servers in one strip and the other half in another strip
D. two single-module UPSs each fed from separately derived utility sources; sources that come from one of two independent utility substations
Answer: A

4. You have specified that a 1000 VA rack-mount UPS solution be added to your client’s existing data center. Considering the size of the UPS, which service product is appropriate?
A. Load Bank
B. Thermography
C. Extended Warranty
D. Preventive Maintenance
Answer: C

5. Which two products are appropriate for an IT network wiring closet? (Choose two.)
A. single-phase UPS
B. 800 amp DC rectifier
C. 4-post open frame rack
D. 10kVA three-phase UPS
E. 15-ton computer room air conditioner
Answer: AC

6. A company has a 30kW N+1 InfraStruXure solution in their small data center. In the event of a power module failure, it wants e-mail notification that there is a loss of redundancy. The only connection is a LAN connection for monitoring. What should you do?
A. using the InfraStruXure Manager, connect into the RJ45 port and configure the e-mail notification feature
B. using an Out of Band Management Card, connect into an external modem and configure the e-mail notification feature
C. using the serial port on the UPS, connect the UPS solution to a desktop computer and configure the e-mail notification feature
D. using the Building Management Card, connect the UPS solution to the facility Building Management software and configure the e-mail
notification feature
Answer: A

7. Click the Calculator button. A medium-size data center has been retrofitted and the new IT equipment requires 39kW at a power factor 0.90. The existing UPS system is 40kVA. Which two actions should you take? (Choose two.)
A. keep the actual UPS system: 40kVA means 40kW
B. replace the diesel generator to cover the extra load
C. replace the actual UPS system with a minimum 45kVA
D. check the entire UPS installation to make sure it is able to support the new load
Answer: CD

8. What is a common application for 2-post racks?
A. telecom
B. server room
C. remote office
D. IT data center
Answer: A

9. An IT manager wants one hour of UPS runtime on a Voice over IP (VoIP) solution that will be located in a small wiring closet. To get the full hour of runtime and continuous operation, what else must be in place?
A. The closet must have sufficient cooling for that period.
B. Shutdown software should be loaded on the VoIP server.
C. The UPS must be oversized in wattage to provide this runtime.
D. The equipment must be installed in a full enclosure for proper security.
Answer: A

10. If a company requests that its UPS output power be distributed to the racks through an isolation transformer, what are they trying to do?
A. decrease the cable size to the load
B. increase the efficiency of the system
C. increase availability throughout the data center
D. prevent electrical noise from locking up the servers
Answer: D

11. A remote office for a small business has 20 employees. Its IT equipment supports four file servers, e-mail, storage, and Internet access. Which three products are appropriate for this office’s IT room that has no IT staff? (Choose three.)
A. 30kW N+1 UPS
B. 12kVA N+1 UPS
C. 4-post rack
D. 15-ton computer room air conditioner
E. remote security and environmental monitoring
Answer: BCE

12. What are two reasons why a fully rated UPS (output kW = output kVA) is more compatible with today’s IT loads than an 80%-rated UPS (output kW = output kVA at a 0.8 power factor)? (Choose two.)
A. 80%-rated UPSs are more efficient.
B. Today’s IT loads are power-factor corrected.
C. Fully-rated UPSs have superior output voltage control.
D. Fully-rated UPSs make it less likely to undersize the UPS.
E. Today’s IT loads lock up when powered by an 80%-rated UPS.
Answer: BD

Recommended Training about APC PB0-200 testing Fromat

The following courses are the recommended training for PB0-200 PDF Fromat.

PB0-200 Q & A with Explanations

PB0-200 Audio video download

PB0-200 Study Guide materials

PB0-200 Preparation Labs

PB0-200 paper books

PB0-200 rapidshare 4shared sadikhov links

PB0-200 torrent notes

PB0-200 TestInside

PB0-200 sample print pdf version

Why do you Choose PassQuick PB0-200 Test Engine?

Quality and Value for the PB0-200 Exam

PassQuick Practice Exams for APC Certification PB0-200 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass PB0-200 Exam

If you prepare for PB0-200 exam using our PassQuick exams, we guarantee your success in the first attempt. If you do not pass the PB0-200 exam on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

Nov
02

PassQuick PB0-100 Practice Exams Description

Exam Number/Code: PB0-100

Exam Name: APC NCPI Design

VUE Code: PB0-100

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the PB0-100 exam? Searching PB0-100 Braindumps, APC PB0-100 Test Questions, PB0-100 Practice Exam, PB0-100 Dumps? PassQuick PB0-100 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick PB0-100 is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

Recommended Training about APC PB0-100 testing Fromat

The following courses are the recommended training for PB0-100 PDF Fromat.

PB0-100 Q & A with Explanations

PB0-100 Audio video download

PB0-100 Study Guide materials

PB0-100 Preparation Labs

PB0-100 paper books

PB0-100 rapidshare 4shared sadikhov links

PB0-100 torrent notes

PB0-100 TestInside

PB0-100 sample print pdf version

Why do you Choose PassQuick PB0-100 Test Engine?

Quality and Value for the PB0-100 Exam

PassQuick Practice Exams for APC Certification PB0-100 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass PB0-100 Exam

If you prepare for PB0-100 exam using our PassQuick exams, we guarantee your success in the first attempt. If you do not pass the PB0-100 exam on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

Sep
11

PassQuick DU0-001 Practice Exams Description

Exam Number/Code: DU0-001

Exam Name: Data Center University Associate Certification

VUE Code: DU0-001

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the DU0-001 exam? Searching DU0-001 Braindumps, APC DU0-001 Test Questions, DU0-001 Practice Exam, DU0-001 Dumps? PassQuick DU0-001 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick DU0-001 is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

Recommended Training about APC DU0-001 testing Fromat

The following courses are the recommended training for DU0-001 PDF Fromat.

DU0-001 Q & A with Explanations

DU0-001 Audio video download

DU0-001 Study Guide materials

DU0-001 Preparation Labs

DU0-001 paper books

DU0-001 rapidshare 4shared sadikhov links

DU0-001 torrent notes

DU0-001 TestInside

DU0-001 sample print pdf version

Why do you Choose PassQuick DU0-001 Test Engine?

Quality and Value for the DU0-001 Exam

PassQuick Practice Exams for APC Certification DU0-001 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass DU0-001 Exam

If you prepare for DU0-001 exam using our PassQuick exams, we guarantee your success in the first attempt. If you do not pass the DU0-001 exam on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

Aug
24

PassQuick DU0-001 Practice Exams Description

Exam Number/Code: DU0-001

Exam Name: Data Center University Associate Certification

VUE Code: DU0-001

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the DU0-001 exam? Searching DU0-001 Braindumps, APC DU0-001 Test Questions, DU0-001 Practice Exam, DU0-001 Dumps? PassQuick DU0-001 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick DU0-001 Dumps is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

APC DU0-001 Exam

Aug
08

PassQuick PB0-100 Practice Exams Description

Exam Number/Code: PB0-100

Exam Name: APC NCPI Design

VUE Code: PB0-100

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the PB0-100 exam? Searching PB0-100 Braindumps, APC PB0-100 Test Questions, PB0-100 Practice Exam, PB0-100 Dumps? PassQuick PB0-100 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick PB0-100 Dumps is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

APC PB0-100 Exam

Jun
21

 
 
Exam : APC PB0-200
Title : APC NCPI Design

1. What is a common application for 2-post racks?
A. telecom
B. server room
C. remote office
D. IT data center
Answer: A

2. What is the most accurate way to determine the capacity of an existing standby generator?
A. ask the facility manager
B. calculate 30% over the UPS capacity
C. look at the generator name plate in the genset room
D. calculate capacity based on the load the generator is powering
Answer: C

3. What are two reasons why a fully rated UPS (output kW = output kVA) is more compatible with today’s IT loads than an 80%-rated UPS (output kW = output kVA at a 0.8 power factor)? (Choose two.)
A. 80%-rated UPSs are more efficient.
B. Today’s IT loads are power-factor corrected.
C. Fully-rated UPSs have superior output voltage control.
D. Fully-rated UPSs make it less likely to undersize the UPS.
E. Today’s IT loads lock up when powered by an 80%-rated UPS.
Answer: BD

4. If a company requests that its UPS output power be distributed to the racks through an isolation transformer, what are they trying to do?
A. decrease the cable size to the load
B. increase the efficiency of the system
C. increase availability throughout the data center
D. prevent electrical noise from locking up the servers
Answer: D

5. How do you achieve full system redundancy in a precision air conditioning system?
A. install multiple air conditioning systems in an N+1 configuration
B. install a properly-sized DX air cooled unit with chilled water back-up
C. install a properly-sized air conditioning unit with redundant compressors
D. install Building System cooling (comfort cooling) with an air conditioning unit in standby
Answer: A

6. A site requires redundant power feeds to single-corded servers. What is a possible redundant configuration?
A. two single-module UPSs feeding one rack-mount Automatic Transfer Switch and one outlet strip per rack
B. two single-module UPSs each feeding dual-panel distribution boards, which in turn feed two outlet strips per rack
C. two single-module UPSs each feeding two outlet strips per rack; plugging half the servers in one strip and the other half in another strip
D. two single-module UPSs each fed from separately derived utility sources; sources that come from one of two independent utility substations
Answer: A

7. An IT manager wants one hour of UPS runtime on a Voice over IP (VoIP) solution that will be located in a small wiring closet. To get the full hour of runtime and continuous operation, what else must be in place?
A. The closet must have sufficient cooling for that period.
B. Shutdown software should be loaded on the VoIP server.
C. The UPS must be oversized in wattage to provide this runtime.
D. The equipment must be installed in a full enclosure for proper security.
Answer: A

8. Click the Calculator button. A medium-size data center has been retrofitted and the new IT equipment requires 39kW at a power factor 0.90. The existing UPS system is 40kVA. Which two actions should you take? (Choose two.)
A. keep the actual UPS system: 40kVA means 40kW
B. replace the diesel generator to cover the extra load
C. replace the actual UPS system with a minimum 45kVA
D. check the entire UPS installation to make sure it is able to support the new load
Answer: CD

PassQuick PB0-200 Practice Exams Description

Exam Number/Code: PB0-200

Exam Name: APC NCPI Design

VUE Code: PB0-200

vendor:APC

Exam Language(s): English

Certification: APC practice test

Preparing for the PB0-200 exam? Searching PB0-200 Braindumps, APC PB0-200 Test Questions, PB0-200 Practice Exam, PB0-200 Dumps? PassQuick PB0-200 is written to coincide with the real test by the experienced IT experts and specialists. With the complete collection of PassQuick Questions and Answers, PassQuick PB0-200 Dumps is high enough to help the candidates to easy pass this exam easily without any other study materials and no need to attend the expensive training class.

APC PB0-200 Exam